Tài liệu tham khảo |
Loại |
Chi tiết |
[1] Wei Lo,Yih Tzoo Chen (2007) “Optimization of Contractor’s S Curve”. Construction Automation Group, I.I.T Madras |
Sách, tạp chí |
Tiêu đề: |
“Optimization of Contractor’s S Curve” |
|
[2] Miskawi, Z (1989) “ An S- curve equation for project control”. Journal of Construction Management and Economics |
Sách, tạp chí |
Tiêu đề: |
An S- curve equation for project control |
Tác giả: |
Miskawi, Z |
Nhà XB: |
Journal of Construction Management and Economics |
Năm: |
1989 |
|
[4] Denis F. Cioffi (2005) “A Tool for managing projects: an Analytic Parameterization of the S-Curve”. International Journal of Project Mangement |
Sách, tạp chí |
Tiêu đề: |
A Tool for managing projects: an Analytic Parameterization of the S-Curve |
Tác giả: |
Denis F. Cioffi |
Nhà XB: |
International Journal of Project Management |
Năm: |
2005 |
|
[5] R. Max Wideman (1994) “ A Paragmatic approach to using resource loading, production, and learning curve on construction projects |
Sách, tạp chí |
Tiêu đề: |
A Paragmatic approach to using resource loading, production, and learning curve on construction projects |
Tác giả: |
R. Max Wideman |
Năm: |
1994 |
|
[6] Vandevoorde, S., M. Vanhoucke “ A Comparison of Different Project Duration Forcasting Method Using Erned Value Metrics.” International Journal of Project Mangement |
Sách, tạp chí |
Tiêu đề: |
A Comparison of Different Project Duration Forcasting Method Using Erned Value Metrics |
Tác giả: |
S. Vandevoorde, M. Vanhoucke |
Nhà XB: |
International Journal of Project Management |
|
[7] Gabriel A. Barraza, W Edward Back (2004) “ Probabilistic Forecasting of Project Performance Using Stochastic S Curve.” ASCE 0733-9364 |
Sách, tạp chí |
Tiêu đề: |
Probabilistic Forecasting of Project Performance Using Stochastic S Curve |
Tác giả: |
Gabriel A. Barraza, W Edward Back |
Nhà XB: |
ASCE |
Năm: |
2004 |
|
[8] Crandall, K. C and Woolery ,J.C (1982) “ Schedule Development under Stochastic Scheduling.” ASCE, 108(2) |
Sách, tạp chí |
Tiêu đề: |
Schedule Development under Stochastic Scheduling |
Tác giả: |
Crandall, K. C, Woolery, J. C |
Nhà XB: |
ASCE |
Năm: |
1982 |
|
[9] Youngsoo Jung and Seunghee Kang (2007) “ Knowledge- Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control.”ASCE 0733-9364 (2007) |
Sách, tạp chí |
Tiêu đề: |
Knowledge- Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control |
Tác giả: |
Youngsoo Jung, Seunghee Kang |
Nhà XB: |
ASCE |
Năm: |
2007 |
|
[10] Navon,R (2005) “ Automated Project Performance Control of Construction Projects.” Autom. Constr., 14(4), 467-476 |
Sách, tạp chí |
Tiêu đề: |
“ Automated Project Performance Control of Construction Projects |
|
[11] Deng, M. Z. M., and Hung, Y.E (1998) “Integrated Cost and Schedule control: Hong Kong perspective .” Project management Journal 29(04), 43-49 |
Sách, tạp chí |
Tiêu đề: |
Integrated Cost and Schedule control: Hong Kong perspective |
Tác giả: |
Deng, M. Z. M., Hung, Y.E |
Nhà XB: |
Project management Journal |
Năm: |
1998 |
|
[12] Vandevoorde, S, M. Vanhoucke“A Comparison of Different Project Duration Forecasting Methods using |
Sách, tạp chí |
Tiêu đề: |
A Comparison of Different Project Duration Forecasting Methods |
Tác giả: |
S. Vandevoorde, M. Vanhoucke |
|