Tài liệu tham khảo |
Loại |
Chi tiết |
[1] Mustafa Ozdemir.(2010). A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method |
Sách, tạp chí |
Tiêu đề: |
A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method |
Tác giả: |
Mustafa Ozdemir |
Năm: |
2010 |
|
[4] Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim and Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia |
Sách, tạp chí |
Tiêu đề: |
The significant factors causing delay of building construction projects in Malaysia |
Tác giả: |
Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim, Ernawati |
Năm: |
2007 |
|
[5] Frank D.K. Fugar & Adwoa B. Agyakwah-Baah. (2010). Delay in building construction project in Ghana |
Sách, tạp chí |
Tiêu đề: |
Delay in building construction project in Ghana |
Tác giả: |
Frank D.K. Fugar, Adwoa B. Agyakwah-Baah |
Năm: |
2010 |
|
[8] Sugiharto Alwi and Keith Hampson. (2003). Identifying the important causes of delays in building construction project in Indonesia |
Sách, tạp chí |
Tiêu đề: |
Identifying the important causes of delays in building construction project in Indonesia |
Tác giả: |
Sugiharto Alwi, Keith Hampson |
Năm: |
2003 |
|
[9] Long Le-Hoai, Young Dai Lee, and Jun Yong Lee. (2008). Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries |
Sách, tạp chí |
Tiêu đề: |
Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries |
Tác giả: |
Long Le-Hoai, Young Dai Lee, Jun Yong Lee |
Năm: |
2008 |
|
[10] Đặng Thị Trang. (LVThs - 2008). Ứng dụng Logic mờ trong phân tích chậm trễ và cập nhật tiến độ thích hợp |
Sách, tạp chí |
Tiêu đề: |
Ứng dụng Logic mờ trong phân tích chậm trễ và cập nhật tiến độ thích hợp |
Tác giả: |
Đặng Thị Trang |
Năm: |
2008 |
|
[11] Nguyễn Thành Luân. (LVThs - 2012). Đánh giá các nguyên nhân chậm trễ trong các dự án giao thông sử dụng vốn ngân sách nhà nước |
Sách, tạp chí |
Tiêu đề: |
Đánh giá các nguyên nhân chậm trễ trong các dự án giao thông sử dụng vốn ngân sách nhà nước |
Tác giả: |
Nguyễn Thành Luân |
Năm: |
2012 |
|
[13] Võ Văn Trị. (LVThs - 2013). Phân tích định lượng trách nhiệm các bên trong việc chậm trễ tiến độ xây dựng gây ra bởi công tác làm lại |
Sách, tạp chí |
Tiêu đề: |
Phân tích định lượng trách nhiệm các bên trong việc chậm trễ tiến độ xây dựng gây ra bởi công tác làm lại |
Tác giả: |
Võ Văn Trị |
Năm: |
2013 |
|
[14] Sadi A. Assaf, Sadiq Al-Hejji. (2006). Cause of delay in large construction project |
Sách, tạp chí |
Tiêu đề: |
Cause of delay in large construction project |
Tác giả: |
Sadi A. Assaf, Sadiq Al-Hejji |
Năm: |
2006 |
|
[15] Sadi A. Assaf, Mohammed Al-Khalil, and Muhammad Al-Hazmi. (1995). Causes of delay in large building construction projects |
Sách, tạp chí |
Tiêu đề: |
Causes of delay in large building construction projects |
Tác giả: |
Sadi A. Assaf, Mohammed Al-Khalil, Muhammad Al-Hazmi |
Năm: |
1995 |
|
[16] Azlan Shah Ali, Andrew Smith, Michael Pitt, and Chan Hong Choon. (Malaysia - 2012). Contractors' perception of factors contributing to project delay |
Sách, tạp chí |
Tiêu đề: |
Contractors' perception of factors contributing to project delay |
Tác giả: |
Azlan Shah Ali, Andrew Smith, Michael Pitt, Chan Hong Choon |
Nhà XB: |
Malaysia |
Năm: |
2012 |
|
[17] Pablo Gonzalez, Vincente Gonzalez Ph.D., Keith Molenaar Ph.D. M.ASCE, and Francisco Orozco Ph.D. (2013). Analysis of causes of delay and time performance in construction projects |
Sách, tạp chí |
Tiêu đề: |
Analysis of causes of delay and time performance in construction projects |
Tác giả: |
Pablo Gonzalez, Vincente Gonzalez Ph.D., Keith Molenaar Ph.D. M.ASCE, Francisco Orozco Ph.D |
Năm: |
2013 |
|
[18] Sawsan Rasheed Mohammed & Salsabeel S.Jafar. (2011). Construction delay analysis using daily window technique |
Sách, tạp chí |
Tiêu đề: |
Construction delay analysis using daily window technique |
Tác giả: |
Sawsan Rasheed Mohammed, Salsabeel S. Jafar |
Năm: |
2011 |
|
[19] Barbara M. Byrne, Structural equation modeling with AMOS: Basic concepts, applications, and programming |
Sách, tạp chí |
Tiêu đề: |
Structural equation modeling with AMOS: Basic concepts, applications, and programming |
Tác giả: |
Barbara M. Byrne |
|
[21] Theodore Trauner et al. (2009). Construction Delay, (Second edition) - Understanding, Them clearly, Analyzing them correctly |
Sách, tạp chí |
Tiêu đề: |
Construction Delay |
Tác giả: |
Theodore Trauner |
Năm: |
2009 |
|
[23] Nguyễn Ngọc Nghĩa. (LVThs - 2014). Nghiên cứu các nhân tố gây ra stress đối với kỹ sư xây dựng của nhà thầu làm việc tại công trường ở Tp. HCM |
Sách, tạp chí |
Tiêu đề: |
Nghiên cứu các nhân tố gây ra stress đối với kỹ sư xây dựng của nhà thầu làm việc tại công trường ở Tp. HCM |
Tác giả: |
Nguyễn Ngọc Nghĩa |
Năm: |
2014 |
|
[24] Nguyễn Đình Thọ & Nguyễn Thị Mai Trang. (2008). Nghiên cứu khoa học Marketing - Ứng dụng mô hình cấu trúc tuyến tính SEM, TPHCM: NXB ĐH Quốc gia TPHCM |
Sách, tạp chí |
Tiêu đề: |
Nghiên cứu khoa học Marketing - Ứng dụng mô hình cấu trúc tuyến tính SEM |
Tác giả: |
Nguyễn Đình Thọ, Nguyễn Thị Mai Trang |
Nhà XB: |
NXB ĐH Quốc gia TPHCM |
Năm: |
2008 |
|
[26] Hoàng Trọng & Chu Nguyễn Mộng Ngọc (2008). Phân tích dữ liệu nghiên cứu với SPSS tập 1, 2, Nhà xuất bản Hồng Đức, Tp. Hồ Chí Minh |
Sách, tạp chí |
Tiêu đề: |
Phân tích dữ liệu nghiên cứu với SPSS tập 1, 2 |
Tác giả: |
Hoàng Trọng, Chu Nguyễn Mộng Ngọc |
Nhà XB: |
Nhà xuất bản Hồng Đức |
Năm: |
2008 |
|
[2] Bon-Gang Hwang, Xianbo Zhao, Si Yi Ng. (2012). Identifying the critical factors affecting schedule performance of public housing projects, Singapore |
Khác |
|
[3] Adel Al‐Kharashi & Martin Skitmore. (2009). Causes of delays in Saudi Arabian public sector construction projects |
Khác |
|